Arkansas Highway and Transportation Department - Lane Closures

Neither the map nor the text report show short-term lane closures (those where the lane is closed for less than 4 hours) or moving lane closures necessary for some maintenance or construction activities. For information on short-term closures or moving lane closures, please contact the District Engineer for the District or county in question. An underlined "Begin Date" represents planned closures.

Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
1Monroe10602.663.50Alternating North & South Bound09/23/201947:00am-5:30pm14.00FT 12.00HBM POLYMER OVERLAY
2Desha418010.3410.72Alternating East & West Bound09/20/2019Ongoing24 Hours FT 12.00Width Restriction - All Lanes.
6Saline50801.663.97Alternating North & South Bound07/31/2019Ongoing8 p.m.- 6 a.m.10.00FT17.0010.00Job 061335 alternating lane closures with flaggers or traffic control devices.
8Pope716018.8619.03South Bound07/23/2019Ongoing24 Hours FT 8.50Slide repair
9Newton718010.5013.50Width Restriction Only06/24/2019Ongoing24 hours11.00FT 11.00Width Restriction - All Lanes. 090501
8Conway90802.209.15Width Restriction Only08/01/2019ongoing24 hours FT 10.00080494 - safety impvts project - new location tie-ins and notch/widening
6Pulaski100806.707.20East Bound Outside11/27/2018ongoing8 P.M. - 6 A.M. FT 11.00061331 Subsurface Investigations for project.
6Pulaski100807.107.80West Bound Outside11/27/2018ongoing8 P.M. - 6 A.M. FT 11.00061331 Subsurface Investigations for project.
5Independence140802.663.19All05/24/2019Ongoing24 Hours12.00FT 12.00Miscellaneous Rehabilitation.
4Franklin2306012.0412.25Alternating North & South Bound09/23/201948:30am-5:00pm14.00FT 11.00HBM BRIDGE REPAIRS
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
4Franklin2307010.2024.51Alternating North & South Bound05/03/2019Ongoing7am - 7pm12.00FT 9.00Asphalt Paving Operation. Miscellaneous Rehabilitation. 040726 Project
5Independence2505010.0018.72Width Restriction Only08/08/2019Ongoing24 Hours10.00FT 10.50ArDOT Job 050367. Paving operations and shoulder widening.
4Scott280100.0015.88Alternating East & West Bound08/03/2019Ongoing7am to 7pm11.00FT 8.00Asphalt paving operation and dirt work operation to widen roadway. Project R40104.
3Miller301107.0017.04Alternating East & West Bound05/13/2019Ongoing24 hours15.00FT 12.00Alt. EB and WB inside and outside lane closures to repair joint sealant.
3Miller301109.8710.25East Bound Outside09/23/201946:30am-4:00pm14.00FT 12.00HBM PAINTING BRIDGE
3Hempstead3012035.0040.10East Bound06/25/2019Ongoing24 hours FT15.00 Job BB1101, Reduce vertical clearance to 15.0 feet for overpass rehab.
3Hempstead3012035.0040.10East & West Bound02/22/2019Ongoing24 Hours13.00FT 10.00Job BB1101, alternating inside and outside closures
3Nevada3013040.1653.15East & West Bound02/22/2019Ongoing24 Hours13.00FT 10.00Job BB1101, alternating inside and outside lane closures
3Nevada3013040.1647.00East Bound06/25/2019Ongoing24 hours FT15.00 Job BB1101, Reduce vertical clearance to 15.0 feet for overpass rehab.
7Clark3014053.1557.00East & West Bound02/26/2019Ongoing8 pm - 10 am14.00FT 11.00Alternating inside and outside lanes.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Saline30220106.00116.69Alternating East & West Bound05/09/2019Ongoing24 hours FT 10.00CA0601 Lane Restrictions - East and West Bound - Saline County
3Little-River320308.4710.05All09/24/201937:00 p.m - 5:00 a.m. FT  Bridge deck repairs on Millwood Dam. Night work. Follow Detour.
3Hempstead320400.001.39All09/24/201937:00 p.m. - 5:00 a.m. FT  Bridge deck repairs on Millwood Dam. Night work. Follow Detour.
1Crittenden381000.000.79North Bound Inside07/27/2019Ongoing24 Hours10.00FT 7.00110650 Stage 3 (Traffic in outside lanes)
1Crittenden381000.000.79South Bound Inside07/27/2019Ongoing24 Hours10.00FT 7.00110650 Stage 3 (Traffic in outside lanes)
4Crawford401103.0017.00East Bound09/22/2019Ongoing8 p.m. - 6 a.m.13.00FT 10.00Resurfacing asphalt pavement and guardrail replacement using 2 mile lane closures. BB0401 project.
4Crawford401108.0017.00West Bound09/04/2019Ongoing8 p.m. - 6 a.m.13.00FT 10.00Resurfacing asphalt pavement and guardrail replacement using 2-mile lane closures. BB0401 project.
8Conway40310114.99118.30West Bound Outside09/23/201948:00 a.m. - 6:00 p.m. FT 12.00Asphalt Paving Operation.
8Conway40310116.00116.10West Bound Inside09/23/201948:00 a.m. - 6:00 p.m. FT 12.00Asphalt Paving Operation.
6Pulaski40330145.00146.50East Bound Outside09/12/20192024 hrs FT 24.00Job 061190-EB Outside lane closed for Ramp tie-ins, Epoxy Overlay, approach slab reconstruction.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Pulaski40330145.50146.50West Bound Outside09/24/20192024 Hours FT 24.00061190-WB Outside lane closed for Ramp tie-ins, Epoxy Overlay,
6Prairie40420199.00202.00Right Shoulder04/10/2017Ongoing24 Hours FT 20.00Job BB0610 Concrete Barrier Wall installed on WB right shoulder
6Prairie40420200.00202.00Right Shoulder04/24/2017Ongoing24 Hours FT 20.00Job BB0610 Concrete Barrier Wall installed on EB right shoulder
1St.-Francis40510248.10264.57West Bound Outside03/29/2018Ongoing7:00 p.m. to 8:00 a.m.14.00FT 11.00BB0116 - Punch List work
1St.-Francis40510248.10264.57East Bound Outside05/08/2018Ongoing8:00 p.m. to 9:00 a.m.14.00FT 11.00BB0116 - Punch List work
1St.-Francis40510259.00263.00Alternating East & West Bound07/11/2019Ongoing7 p.m. - 9 a.m.18.00FT 15.00Jobs BB0113/BB0114 - Alternating Lane Closures, Bridge Deck Sealing
1Crittenden40520264.57277.00Alternating East & West Bound05/02/2016Ongoing8:00 p.m. to 8:00 a.m.14.00FT 11.004 miles lane closures for paving/ditch paving - BB0107.
1Crittenden40520280.32280.80West Bound On Ramp09/05/2019Ongoing24 Hours FT  WB On Ramp closed for reconstruction.
1Crittenden40520280.73281.18West Bound Outside09/05/2019Ongoing24 Hours26.00FT 23.00WB Off Ramp closed for reconstruction. Lane closure for ramp work.
1Phillips4910017.3028.75Alternating North & South Bound05/20/2019Ongoing7a.m. - 7 p.m.12.00FT 12.00Job 110656
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
4Crawford4927038.2038.70Right Shoulder09/12/2019Ongoing7 a.m. - 7 p.m. FT  Performing repair to concr. ditch paving located on the slope. No work on Friday. BB0409 project.
4Washington4928047.0050.00South Bound Inside06/03/2019Ongoing24 Hours17.00FT 16.00Bridge repairs. Alt inside and outside lanes.
4Washington4928074.0074.18South Bound09/16/2019610:00PM-6:00AM12.00FT 12.00Job 012215 - Overhead Sign Structure Work
8Faulkner600006.456.73Alternating East & West Bound09/04/20192008:30a.m. - 04:00p.m.14.00FT  doing routine bridge maintenance
8Perry600100.000.36Alternating East & West Bound09/04/20192008:30a.m. - 04:00p.m.14.00FT  Doing routine bridge Maintenance
9Boone650206.1210.49Width Restriction Only11/13/2017Ongoing6:00 am - 6:00 pm13.00FT 10.00Pavement Removal. Width Restriction - All Lanes.
8Van-Buren650707.7710.00North & South Bound08/06/2019Ongoing24 Hours FT 12.00Width restriction in conjunction with Project CA0801 out of the RE84 Office.
8Van-Buren650806.5011.14North & South Bound08/05/2019Ongoing24 Hours FT 12.00Width restriction in conjunction with Job 080423 out of RE84 Office
3Miller6701018.1018.30North Bound09/25/201917:00 a.m. - 12:00 p.m.12.00FT 10.00Red River Bridge inspection.
5White671309.1520.81Alternating North & South Bound04/29/2019Ongoing24 Hours12.00FT 9.00Width Restriction- Pavement Patching and Grinding. ARDOT Job 050375
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
5Jackson671400.0015.68Alternating North & South Bound04/29/2019Ongoing24 Hours12.00FT 9.00Width Restriction - Pavement Patching and Grinding ARDOT Job 050375
5Jackson671500.000.02Alternating North & South Bound04/29/2019Ongoing24 Hours12.00FT 9.00Width Restriction - Pavement Patching and Grinding ARDOT Job 050375
3Pike700509.0512.18Alternating East & West Bound08/12/20191307:00 am-8:00 pm12.00FT 11.00Asphalt Paving Operation. Moving Lane Closure in Alternating Lanes. Job 012329
8Montgomery700600.005.82Alternating East & West Bound08/12/20191307:00 a.m. - 8:00 p.m.12.00FT 11.00Asphalt Paving Operation. Moving Lane Closure in Alternating Lanes. Job 012329
6Hot-Spring700700.003.66Alternating East & West Bound08/12/20191307 a.m. - 8 p.m.12.00FT 11.00Asphalt Paving Operation. Moving lane closure in Alternating lanes. Job 012329
6Garland700800.008.10Alternating East & West Bound08/12/20191307 a.m. - 8 p.m.12.00FT 11.00Asphalt Paving Operation. Moving lane closure in Alternating lanes. Job 012329
6Garland700902.612.64West Bound Off Ramp09/25/201919 A.M. - 3 P.M.13.00FT 10.00Bridge Inspection BR 06948 Hwy 70 Flyover - Hot Springs Bypass
1Crittenden702000.003.60Alternating East & West Bound05/20/2019Ongoing6 a.m. - 7 p.m.19.00FT 16.00Milling and paving operations. Flagging operation.
1Crittenden702006.708.75Alternating East & West Bound05/20/2019Ongoing6 a.m. - 7 p.m.20.00FT 17.00Milling and paving operations. Flagging operation.
1Crittenden702009.3011.05Alternating East & West Bound05/20/2019Ongoing6 a.m. - 7 p.m.20.00FT 17.00Milling and paving operations. Flagging operation.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
1Crittenden7020014.6614.72East Bound Center07/09/2019Ongoing2422.00FT 19.00Width Restriction - Eastbound Lanes Only. Turn lane closure.
1Crittenden7020014.7214.85West Bound Outside07/09/2019Ongoing24 Hours12.00FT 9.00Width Restriction - Westbound Lanes Only.
9Benton7118B10.8011.80East & West Bound09/16/2019128PM-7AM  FT 12.00BB0903 - To hang girders and install safety platforms. Complete closure for 15 minute intervals.
9Benton7118B10.8011.80North & South Bound11/03/2018Ongoing24 Hours FT14.0024.00BB0903 Not for lane closure - Reduced Vertical Clearance
9Benton7119B0.001.00North & South Bound11/03/2018Ongoing24 Hours FT14.0024.00BB0903 Not for lane closure - Reduced Vetical Clearance
9Benton7119B0.011.00East & West Bound09/16/2019128PM-7AM FT 12.00BB0903 - To hang girders and install safety platform. Complete closure for 15 minute intervals.
9Benton7119B1.447.04Alternating East & West Bound09/02/2019319PM-7AM FT 12.00090561 - Removing plowable RPMs, milling, and asphalt operations
1Lee791601.752.00Alternating North & South Bound09/23/201947:00am-5:30pm12.00FT 10.00HBM CREWS WORKING ON BRIDGE
3Lafayette820200.0016.95Alternating East & West Bound06/26/2019Ongoing6:00 a.m. - 8:00 p.m.13.00FT 10.00Milling and overlay operations for Job 030540.
2Ashley8208016.0017.25Right Shoulder11/14/2017Ongoing24 hours12.00FT 11.00Width Restriction - All Lanes. Alternating Shoulder Closures. Job 020534
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
2Ashley8208017.5022.87Alternating North & South Bound04/02/2019Ongoing24 Hours11.00FT14.0011.00Alternating lanes- notch and widening Project CA0202
8Johnson1030100.000.60North & South Bound08/07/2013ongoing24 Hours11.00FT 11.00Width Restriction - All Lanes. Installation of Centerline Islands with Light Poles
10Poinsett13501012.8913.00North Bound09/23/201947:00am-5:30 pm10.00FT 10.00HBM CREWS BRIDGE WORK
7Calhoun1670401.005.00Width Restriction Only04/11/2018ongoing249.00FT 9.00Notch
9Carroll1870106.056.31All10/02/2018Ongoing24 Hours FT  Closing to perform required maintenance on Beaver Dam.
4Franklin2190104.905.10Alternating North & South Bound05/20/2019on going24 hours12.00FT 9.00Bridge Work
4Washington2440201.301.60Alternating East & West Bound10/22/2018Ongoing24 Hours12.00FT19.0010.00Routine bridge maintenance. Temporary signals in use.
4Washington2650204.054.20North Bound Outside09/24/2019118:30 am - 5:00 pm11.50FT 8.50Wide Loads must use Alternate Route.
2Arkansas3430100.170.17All06/10/201913124 Hours FT  Bridge replacement, detour in place.
5White3671500.002.60Alternating North & South Bound06/11/2019Ongoing24 Hours13.00FT 10.00Asphalt Paving Operation.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
4Washington4120200.0014.03East & West Bound08/05/2019609:00PM-7:00AM24.00FT 11.00 Asphalt Paving Operation. Moving lane closure in Alternating lanes.
4Washington4120200.600.70East & West Bound08/19/2019302412.00FT  Job 040774 - Bridge Resurfacing
10Lawrence4120701.707.70Alternating East & West Bound06/07/2019ongoing2410.00FT  Width Restriction - All Lanes.
10Greene4120800.008.30Alternating East & West Bound06/07/2019ongoing2410.00FT  Width Restriction - All Lanes.
2Ashley4250100.009.34North & South Bound06/10/2019Ongoing24 Hours11.00FT 10.00 
2Jefferson53005035.0039.00North & South Bound11/28/2017Ongoing24 Hours FT 12.00Crossover-both directions on Southbound side. Median and Outside Shoulder Work. Job BB0203
2Jefferson53005042.0046.00North & South Bound05/20/2019Ongoing24 Hours FT 12.00 
4Sebastian5400108.009.00North Bound09/15/2019Ongoing8 p.m. - 6 a.m.15.00FT 12.00Performing polymer overlay on bridge deck of Ark. River Relief Bridge. BB0401 Project.
4Crawford54002013.0014.00North Bound09/17/2019Ongoing8 p.m. - 6 a.m.15.00FT 12.00Performing polymer overlay of SH162 and UPRR bridge decks. BB0401 project.
4Crawford54002014.2614.74South Bound Outside09/11/2019Ongoing24 Hours11.00FT 8.00Bridge deck rehab. on ramp bridges on Exit 7, I-40 WB to I-540 SB. Narrow Lane. Job BB0401.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Pulaski6302104.007.00East & West Bound07/16/2018Ongoing8 p.m. - 6 a.m. FT  Job CA0608. Nightly and Saturday EB and WB double lane closures during off-peak hours.